Stuttgart, 18. March 2019

Review of ISH 2019 | BIM becomes more and more important!

The ISH 2019 is over. What remains are great contacts, good conversations, interesting insights and new approaches to think about. BIMsystems has again shown the enormous role that the Component Management System in the BIM context. And from which significant advantages general contractors, manufacturers, planners, architects and others benefit.

Rückblick von ISH 2019 zeigt, dass BIM immer wichtiger und wichtiger wird

Figure 1: Review of 2019 shows that BIM is becoming more and more important and significant (Source: BIMsystems GmbH)

The most important finding of ISH 2019 in advance: companies from the construction industry are unsure about BIM. The first steps have been taken. But offers of new technologies, systems and tools unsettle decision-makers in retrospect. That's what change through digitization brings. We understand that.

But there is hope. Disrupt the Disrupters! This was the motto of BIMsystems at this year's ISH exhibition. Under this motto, we showed the advantages of the BMS - the future viability for BIM processes. And we showed why it pays to rely on a future-oriented and stable technology.

BIMsystems' unique technology is based on alphanumeric coding. And thus the abandonment of IFC and other exchange formats. The BIM model is centrally located on a database - with access via plugin into the CAD systems and the web browser.

That is why our technology is particularly interesting for general contractors, manufacturers and planners:

  • Less manufacturer effort: BIM content is prepared once for the BMS for the common CAD systems - instead of per CAD system. In addition, internal company databases, such as PIM systems, can be linked and BIM content generated automatically.

  • Less planner effort: By enriching the generic BIM content with attributes during the process, specific manufacturer BIM content can be filtered according to these requirements and loaded directly into the BIM model via the plug-in.

  • Greater collaboration: Without using IFC, real-time collaboration can take place between the various construction stakeholders, and manufacturers advise designers directly through the BMS.

  • More information: In addition to the geometric data, additional important information is linked to BIM content without increasing the storage capacity of the BIM model - for specific and generic BIM content.

Time and cost savings are benefits that construction stakeholders usually do not suspect behind BIM. But with BIMsystems it becomes possible!

Figure 2: Impressions of the ISH 2019 (Source: BIMsystems GmbH)

The ISH visitors go home with many new impressions around BIM, component management system and BIMsystems. If you also still want to access the Infopackage with current screencasts, DEMO videos and infographics, request it here.

We thank you for the great and interested visitors - and we are already looking forward to the further events like the polis Convention and BIM World 2019 this year!